The report of a goods train accident that happened two days ago on the Gaya-Dhanbad route has come to the fore. In this report, a clean chit has been given to the guard and the pilot. It is told that both the guard and the pilot tried their best to stop the train, but due to brake failure, its speed kept increasing. On the track on which this train was running, it was to be run only at the speed of 30Km/h. But due to the slope, the speed increased and the rest of the bogies derailed and overturned. The final investigation report of this major accident has been received by Dainik Bhaskar. Read what happened with the goods train that day…
It has been told in the investigation report that there was no lapse of the pilot and co-pilot and guard of the train in the accident. Together, both of them made every effort to save the train from their respective places. In such a situation, now the technical test of the engine of the train concerned will be done, only then the reason for the brake failure will be clear. Technical test of the locomotive is not possible at the site.
Coal spread on both sides of the track was causing trouble in the operation.
It has been told in the investigation report that there is a possibility that the train derailed due to failure of brakes of the vehicle. After this, the column responsible for brake failure has been fixed as (1) Carriage and Wagon Department, BPC issuer and (2) Locoshed Kanpur.
These things have been mentioned in the investigation report
A total of 20 points have been mentioned in the investigation report. At present, the loss on the spot has been estimated to be more than Rs 12 crore. Also, it has been told in the investigation report that according to the written statement of the pilot and guard to the loco pilot, the train opened from Hazaribagh Town at 12:20, stopped at different stations, stopped at Gajhandi station in the up second loop at 4:22 and then Opened at 5:55 am. After which he got the home signal check of Lalbagh station and passed it at 6:05 am.
The story of this accident begins from here
Everything was fine till now, but after moving ahead from Lalbagh, pressure was dropped to control the speed on the slope but the speed control was not done. The speed kept increasing. The loco pilot and co-loco pilot applied the emergency brake but the vehicle was not controlling. The guard was then asked to apply the brakes through the walkie talkie and through three small whistles. Also the flashlight was lit. Meanwhile the red flag was shown to the station. All right signal was also exchanged by the station master. After this the guard dropped the pressure from the brake van but still the speed of the vehicle did not decrease. Signals were up-through at all stations on the way. But the up home signal of Gurpa station was red. Meanwhile, the train went into the loop line and in one stroke 53 bogies got derailed.
10 cranes, more than 20 JCBs were engaged in clearing the track day and night.
112 kilometer per hour has been found
The investigation starts from the station master’s panel room. The point set for the up-loop line and run-off line has been found on the panel. At the same time, the up home signal of Gurpa station was passed by the loco pilot in red position. This was also found in writing. Apart from this, the up loop of Gurpa station was track feet for a speed of 30 kmph but due to brake failure and slope, the speed of the train has been found to be 112 kmph as per the speed chart. Because of which this big accident happened.
This investigation report has been prepared by seven officers of different departments of the Railways. The inquiry report has been sent to Headquarters. The investigation report also states that the engine speed is restricted to 100 km.
Read more news related to the incident…
Train ran on Gaya-Dhanbad track after 54 hours: 53 bogies of goods train were derailed, 600 employees; 20 cranes were installed
Gaya-Dhanbad railway route has been cleared after 54 hours. On this, a goods train was first passed on the track around one and a half o’clock. A goods train carrying coal was de-railed at Gurpa railway station on Wednesday. Since then, the track improvement work is going on. 600 laborers, 10 cranes, more than 20 JCBs were engaged in the operation day and night. Gaya-Dhanbad railway route has been cleared after 2 days. After 1 pm, the goods train was run from the down loop. The second goods train was run from the down loop at 2 o’clock. Down main line likely to be operational in 5-6 hours. Click here to read full news
Live VIDEO of goods train accident in Gaya: Brake failed while descending from the valley, 57 bogies overturned at a speed of 150KM
The brakes of a goods train failed while descending from the valley on the Gaya-Dhanbad route. Due to this the speed of the goods train reached 150KM per hour. An attempt was made to stop it by slip siding before Gurpa station. During this, 57 bogies were overturned due to the breakdown of the coupling. While the engine kept running with a bogie. However, due to bogie rubbing and slip siding, the engine stopped after going 400 meters away. Click here to read full report